BLADE RAISER
The barrier segments of steel beam guard rail must first be bolted together and placed on the ground before handling them with the Blad Raiser.
Then, The crawler-mounted pile driver equipped with the Blade Raiser lifts off the ground the attached segments, such action ease the mounting activity, ensuring the positioning of the blade on exact point for the pile to be installed into the ground and bolted to the rail.